SR 4009 SEC 011
Services Provided
Pre-Bid Design and Consultation,
Preliminary & Final Design
Permitting
Utility Coordination
Right-of-Way
Client
Deblin, Inc.
This project was part of a three bridge replacement package in York County, PA awarded as part of a low-bid design build agreement. The structure replacement consisted of a two-span PA Bulb Tee Beam superstructure supported on full height substructures founded on spread footings. All work was performed under a complete detour.
Key Highlights
The design build project delivery method allows the engineer and contractor team to efficiently and effectively develop the most cost effective solution while residing with the boundaries of the contract requirements.